Solutions
Who We Serve
Nuestras soluciones
A quién servimos
♻️ Gestores e instalaciones

Dos plazos estrictos afectan a su instalación con cada envío entrante.

Confirme la recepción del residuo en un plazo de 3 días hábiles. Emita un certificado de finalización en un plazo de 30 días. Con entre 30 y 50 envíos transfronterizos al mes, la introducción manual en el portal es imposible a gran escala.

Rastreador de envíos entrantes (demo)
PreZero NL · Annex VII ✓ Confirmed
3-day receipt window · Received today
Sita Belgium · Annex VII ⚠ Confirm soon
3-day receipt window · 2 days left
Renewi DE · Annex IA ✗ Alert sent
3-day receipt window · Overdue - 1 day
Con Evreka: la confirmación de recepción ocurre automáticamente en el registro de entrada
Sus riesgos específicos

Qué significa DIWASS para los gestores

⏱️
3-day receipt deadline

Confirm every incoming cross-border shipment in DIWASS within 3 working days. Missed = automatic ILT alert to sender and regulators.

📜
30-day completion certificate

Processing/completion certificate required within 30 days. At scale, manual generation is operationally untenable.

🔍
Final destination transparency

If you are an intermediate station (sorting, pre-processing), you must declare the final downstream processor in DIWASS. Invisible flows are illegal.

🏆
VGI status protection

Pre-approved facility (VGI) status is tied to DIWASS compliance. Repeated violations risk losing a significant operational advantage.

Cómo ayuda Evreka

Plazos gestionados automáticamente

📥

Intake automation

When a shipment is logged as received in your system, DIWASS receipt confirmation is sent automatically. 3-day window becomes a system guarantee.

📄

Certificate generation

Completion certificates generated from your processing records - not typed manually into a government portal.

🗺️

Chain mapping

We register your full processing chain in DIWASS: primary intake, intermediate processing, and final destination - all linked.

📊

Compliance dashboard

Live view of all incoming cross-border shipments and their DIWASS deadline status. Nothing falls through the cracks.

Su carga de plazos

¿Cuántos plazos DIWASS tiene su instalación este mes?

Cada envío transfronterizo entrante crea dos plazos obligatorios. Calcule los suyos.

30
Plazos de recepción de 3 días
30
Plazos de certificado de 30 días
60
Total de plazos a seguir
Con Evreka: ambos plazos se siguen automáticamente desde el registro de entrada. Sin seguimiento manual.

40 envíos al mes. 40 plazos de 3 días.

La introducción manual en el portal no escala. Automaticemos ahora el cumplimiento de su entrada.

On this page